News: Difference between revisions
From Polstracc
Content deleted Content added
No edit summary |
No edit summary |
||
| Line 4: | Line 4: | ||
'''''13.-14.11.2014'''''<br /> |
'''''13.-14.11.2014'''''<br /> |
||
'''POLSTRACC General Meeting''' at KIT, Karlsruhe: |
'''POLSTRACC General Meeting''' at KIT, Karlsruhe: |
||
Discussion of the timeline, payload, flight operations, certification and logistics of the joint POLSTRACC, GW-LCYCLE and SALSA campaigns. Data products for scientific flight planning are presented and a '''Mission Rehearsal is |
Discussion of the timeline, payload, flight operations, certification and logistics of the joint POLSTRACC, GW-LCYCLE and SALSA campaigns. Data products for scientific flight planning are presented and a '''Mission Rehearsal is planned for early 2015 at DLR, Oberpfaffenhofen.''' |
||
'''''28.05.2014'''''<br /> |
'''''28.05.2014'''''<br /> |
||
Revision as of 21:10, 2 December 2014
02.12.2014
The "Stellprobe" is scheduled for 02.-06.02.2015 at DLR, Oberpfaffenhofen. In the same week, a Status Meeting will take place at the same location.
13.-14.11.2014
POLSTRACC General Meeting at KIT, Karlsruhe:
Discussion of the timeline, payload, flight operations, certification and logistics of the joint POLSTRACC, GW-LCYCLE and SALSA campaigns. Data products for scientific flight planning are presented and a Mission Rehearsal is planned for early 2015 at DLR, Oberpfaffenhofen.
28.05.2014
POLSTRACC Kick-Off-Meeting, DLR Oberpfaffenhofen
22-23.05.2013
POLSTRACC/ROMIC meeting at KIT, Karlsruhe: The scientific objectives of POLSTRACC/GW-LCYCLE are sharpened and the HALO payload configuration is discussed.
